Most of the risk sits in the gaps

Energy projects rarely fail inside a single discipline. They fail in the handovers between them, and that is where we choose to work.

Equi Energy

Ask where an energy project went wrong and the answer is rarely “the engineering” or “the finance”. Each of those was usually done competently by capable people. The trouble sits between them: in what one team assumed and the next team never heard.

That is the idea Equi is built around. Most of the risk in an energy project sits in the gaps, so that is where we work.

Between the strategy and the site

A strategy says what to build, where, and with whom. A site has a grid connection with real constraints, neighbours with real concerns, and ground that may not behave the way the desktop study suggested.

The gap opens when the strategy is written by people who will never stand on the site, and the site is assessed by people who were never told what the strategy needs from it. A project can be exactly right for the portfolio and wrong for the land it has been given.

Closing that gap is mostly a matter of sequence. The questions that can stop a project, such as connection, approvals and access, are worth answering before the ones that only refine it.

Between the model and the contract

A financial model is a set of promises about cost, timing and performance. A contract is where those promises are either made binding or quietly left out.

The gap opens when the two are prepared in separate rooms. The model assumes an availability figure that no contractor has agreed to guarantee. It assumes a completion date that depends on equipment nobody has ordered. Each assumption is reasonable on its own. Together they describe a project that exists only in the spreadsheet.

Someone has to read the model and the contract side by side and ask, line by line, who is carrying each risk and whether they know it.

Between the contract and the people who build it

A contract is written to allocate risk. A project is built by people who need to know what to do on Monday.

The gap opens at handover, when the team that negotiated the deal moves on and the team that has to deliver it inherits several hundred pages and none of the reasoning. Interfaces that were clear in the negotiation become arguments on site.

The fix is unglamorous. The people who will deliver the project should be in the room while it is being shaped, and the people who shaped it should stay close while it is being built.

Why this needs senior people

Spotting a gap takes someone who has worked on both sides of it: who has built the model and lived with the contract, or written the specification and then had to construct against it. That kind of judgment comes from having been wrong before, on a real project, and remembering why.

It is also why we keep the firm small. The person who scopes your work is the person who does it, so nothing is lost between the proposal and the job.

Bring us in early

Gaps are cheapest to close before anything is signed. A short conversation at the idea stage is worth more than a long one after financial close.

If you have a project that is taking shape, or one that has stalled between two of these stages, start a conversation.